← All projects
2024 – 2025 · Full-stack engineer, SolidWall Consulting
Tartib 2.0
National platform for tracking and prioritising public investment projects: 50+ state programmes, one shared scoring model and a map of every project.
What the platform does
- Project entry by ministries and supervisory bodies: identity, economic nature, scale, risks and linked projects.
- An admissibility grid, then a sectoral and a central evaluation using three-level grids: components, criteria and indicators.
- Configurable weights per component and per criterion, with the original and the adjusted score shown side by side.
- Project ranking and prioritisation, National Development Plan axes and a geographic bonus per governorate.
- Funding sources, tranches and extensions, with validation of reservations.
- Server-side PDF reports and real-time notifications.
Project map (OpenStreetMap)
Every project is placed on an OpenStreetMap map using the administrative divisions: governorate, delegation and sector. Clicking a marker opens a project card with the essentials (lead ministry, cost, progress, score) and a link to the full file. The map shows at a glance how investment is spread across regions, which matters for the geographic bonus.
OpenStreetMap was chosen because it needs no API key and has no usage billing, which keeps hosting simple on government infrastructure.
Technical architecture
- Spring Boot back end organised as a modular monolith: controllers, services, implementations, repositories and DTOs per domain.
- PostgreSQL, with the schema versioned by Liquibase.
- Spring Security with JWT, and roles that keep each ministry’s data separate.
- WebSocket notifications, Thymeleaf and Flying Saucer for PDF reports.
- Angular front end, an OpenStreetMap map and radar charts for scores.
- Docker images for production at the CNI and a demo instance on an OVH VPS.
My part of the work
- Data model for the evaluation grids and the score calculation.
- REST API and nested responses for project files.
- Roles and access rules for around 100 users from different ministries.
- Progress dashboards and the production release on CNI servers.